3
CLASSIC 1000
REMOTE COOLER
5. The cooler is factory set on icebank mode. If
necessary, select water bath setting using the switch
behind the lower front panel.
6. Connect product coils to product lines. Check for
leaks.
7. Connect the recirculation lines to the ball valves.
Open both valves and top up the water level where
necessary.
8. Check the water flow. Remove the flow adjuster if
necessary.
9. Allow the cooler to build up its icebank (5 hours
minimum).
1. Installation must be carried out by a suitably trained
person and comply with national and local codes for
connection to the electrical supply.
2. Remove the packaging and fill the water bath with
cold mains water, to the level of the overflow. (The
cooler should not be moved once the water bath has
been filled with water.)
3. Assemble Ball Valves to pump. Ensure these are
closed. Check pump is plugged in.
4. Connect the 3 pin plug to the mains and switch on.
The mains on neon should illuminate.
Filler cap
Fill water bath here
Mains on indicator
Ice bank/water
bath switch
WARM AIR
EXHAUST
COOL AIR
INLET
15mm Ball valves
Open
Moulded mains
plug with 10A fuse
Overflow
Brass tails – to be used when
recirculation lines are
1
/
2
" I.D.
Flow adjuster –
remove for increased flow
Closed
➚
➚
Plug for pump
24v socket
2.3 INSTALLATION